BP113883 - 80 Cliff
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113883 - 80 Cliff | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 80 Cliff |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP113883 |
| Date Application Submitted: | April 07, 2009 |
| Application Description: |
Add 3 residential suites onto existing one storey garage built under BP111051. Alternative Solution for egress from dwelling units and combustible projections at property lines, which includes water curtains in the new and existing bldg. 144m2, 4 storey, Building Classification 3.2.2.45., residential combustible construction, 1hr floor assemblies, load bearing walls and supports, sprinklered with fire alarm system. |
| Application Status: | COMPLETED |
| Permit Value: | $251,000.00 |
| Builder: | RW (BOB) WALL LTD |
| Issued Date: | May 20, 2009 |
| File Close Date: | May 28, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 57 SKINNER STREET | DT5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2010-05-28 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)