BP113814 - 300 60 Commercial
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP113814 - 300 60 Commercial | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 300 60 Commercial |
Type of Application: | Leasehold Improvements |
File Number: | BP113814 |
Date Application Submitted: | March 18, 2009 |
Application Description: |
#300-60 Commercial, Serious Coffee - Accessible - Group A, Division 2, (A2), Floor area =133 m2, (1431 sq.ft.), Leasehold improvement includes interior finishing (millwork,flooring,painting), includes a seating and kitchen/service area. One exit at the front of suite.45 min.FRP/ULC Door btwn Museum & Serious coffee is for convenience only. (Future permit required for tenants for upgrade required to the opening) Occupant load 30 persons. Installation of Two Universal Washrooms & kitchen includes plumbing.Fire stopping system by Fire Protection Engineers Alternative Solutions.See conditions X-Reference BP113841 for landlords work for the rough-in & (slab coring) for one of the washrooms & for the suite separation for the Vertical 2 hr. Fire separation/Fire Resistance Rating demising wall between suites. X-Reference BP110341.VICC, Non-combustible construction, sprinklered with fire alarm. Existing 2hr. FRR/FS btwn Museum & Tenant Space, (CRU). |
Application Status: | COMPLETED |
Permit Value: | $100,000.00 |
Building Area: |
133.00 M2 1,431.60 ft2 |
Builder: | ISLAND WEST COAST DEVELOPMENTS |
Issued Date: | April 28, 2009 |
File Close Date: | June 15, 2009 |
Associated Properties
Address | Zone | More |
---|---|---|
60 COMMERCIAL STREET | DT1 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2009-06-15 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.