BP113760 - 21 - 1406 Jingle Pot
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113760 - 21 - 1406 Jingle Pot | |
|---|---|
| Neighbourhood: | University District |
| Street Address: | 21 - 1406 Jingle Pot |
| Type of Application: | Leasehold Improvements |
| File Number: | BP113760 |
| Date Application Submitted: | March 02, 2009 |
| Application Description: |
Unit # 21 - Mod Hair & Nail Studio. New 51.7 sq m. tenant improvement. This will be a 'D' Occupancy. BP111016 for the original building. Adding new fixtures and finishes, including 2 sprinkler head modifications. Reconfigure 2 fixtures in the washroom. Add 5 sinks, including one hand sink, two shampoo sinks, and two pedicure sinks. A clothes washer and HWT are being added. Cameron Bld, units 20-32 (Bld B) - Part 3, 446 m2 Two storey, sprinklered with fire alarm, 11 residential units, 2 with mezz., 1 lower floor unfinished commercial unit #21 (office), 1 one storey unfinished commercial unit #20 (retail/assembly) with a GFA 114.5m2, inspections under permit BP111017 45 min. Fire Resistance Rating / Fire Separation between residential suites. 1 hr FRR/FS between office use suites and residential; 2 hr FRR/FS between residential or office suite and retail / assembly suite in Bld B. |
| Application Status: | COMPLETED |
| Permit Value: | $25,000.00 |
| Issued Date: | March 23, 2009 |
| File Close Date: | August 07, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 21 1406 JINGLE POT ROAD | CD2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
CANCELLED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2009-08-07 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)