BP113698 - 5398 Norton Road (Parent) - Bldg 4 -- 5402 Jacobs Lane --Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP113698 - 5398 Norton Road (Parent) - Bldg 4 -- 5402 Jacobs Lane --Scanned | |
---|---|
Neighbourhood: | North Slope |
Street Address: | 5398 Norton Road (Parent) - Bldg 4 -- 5402 Jacobs Lane --Scanned |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP113698 |
Date Application Submitted: | June 26, 2008 |
Application Description: |
101 & 102 - 5402 Jacobs Lane (Inspections Only) Building # 4 Unit B10, 101 - 5402 Jacobs Lane, GFA - 147.99 m2 , Garage - 40.32 m2 Unit C11, 102 - 5402 Jacobs Lane, GFA - 147.99 m2 , Garage - 38.22 m2 |
Application Status: | COMPLETED |
Builder: | CAREL PROPERTIES LTD |
Issued Date: | March 17, 2009 |
File Close Date: | July 09, 2010 |
Associated Properties
Address | Zone | More |
---|---|---|
102 5402 JACOBS LANE | R6 | Property Report |
101 5402 JACOBS LANE | R6 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD | CANCELLED |
OCCUPANCY-OLD |
PASSED
2010-07-09 |
OCCUPANCY-OLD | FAILED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.