BP113676 - 4951 Rutherford

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP113676 - 4951 Rutherford
Neighbourhood: Rutherford    
Street Address: 4951 Rutherford
Type of Application: Commercial / Multi / Industrial
File Number: BP113676
Date Application Submitted: February 02, 2009
Application Description: Phase 1 - Building addition to Neighbourhood Church increasing the entry, office area and washroom facilities including adding an accessible washroom. They are also doing Building Code upgrades to various parts of the building as outlined in their Code Report.

64.8 sq m addition to main floor increasing to 450.9 sq m total.
3.6 sq m addition to basement floor increasing to 182.6 sq m total.

Group A, Division 2 Occupancy Building Classification 3.2.2.25. One storey building with basement. Combustible, Unsprinklered without Fire Alarm.

Floor assemblies, roof assemblies, corridors, mechanical room and load bearing walls and supports are required to have 45 min FS/FRR. This buildings occupant load is increasing to 220 persons based on the number of seats in the Multipurpose Area.

Phase 2 requires a future building permit.
Application Status: COMPLETED
Permit Value: $60,978.87
Builder: W R COLCLOUGH & ASSOCIATES LTD
Issued Date: April 24, 2009
File Close Date: April 30, 2010

Associated Properties

Address Zone More
4951 RUTHERFORD ROAD CS1 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2010-04-30

FINAL-OLD

Final approval as per requirements on plans.

FAILED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.