BP113606 - 3206 Arrowsmith Road (Alias of 3200 Arrowsmith Rd.) -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP113606 - 3206 Arrowsmith Road (Alias of 3200 Arrowsmith Rd.) -- Scanned | |
---|---|
Neighbourhood: | Linley Valley |
Street Address: | 3206 Arrowsmith Road (Alias of 3200 Arrowsmith Rd.) -- Scanned |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP113606 |
Date Application Submitted: | December 16, 2008 |
Application Description: |
Construct a two storey single family dwelling on crawlspace with built-in double garage (bonus room above with rough-in 3-piece washroom). Revision March 23/09: - add secondary suite over garage AG Revision approved Oct. 19, 2009 - adding deck/roof over existing deck AG |
Application Status: | COMPLETED |
Permit Value: | $350,000.00 |
Building Area: |
347.27 M2 3,737.98 ft2 |
Builder: | ALAIR HOMES |
Issued Date: | February 13, 2009 |
File Close Date: | July 30, 2010 |
Associated Properties
Address | Zone | More |
---|---|---|
3206 ARROWSMITH ROAD | AR2 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
CANCELLED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
CANCELLED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2010-07-29 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.