BP113583 - 4951 Fillinger
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113583 - 4951 Fillinger | |
|---|---|
| Neighbourhood: | North Slope |
| Street Address: | 4951 Fillinger |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP113583 |
| Date Application Submitted: | December 08, 2008 |
| Application Description: |
For addition of a 6ft. by 12ft. laundry room to a single family dwelling. Revision January 23, 2009 Change location of Washer and Dryer to other end of addition Add laundry tub to other end. Exterior wall containing plumbing to be furred out with 2x2 lumber to provide additional insulation value behind the plumbing to the outside sheathing. All pipes to have no insulation on the drywall side of the installation. Physical File Scanned + attached May 7, 2009 db |
| Application Status: | COMPLETED |
| Permit Value: | $22,000.00 |
| Building Area: |
7.43 M2 79.98 ft2 |
| Builder: | TESS CONTRACTING LTD |
| Issued Date: | January 02, 2009 |
| File Close Date: | February 17, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 4951 FILLINGER CRESCENT | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2009-02-17 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)