BP113565 - 5279 Rutherford - SCANNED

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP113565 - 5279 Rutherford - SCANNED
Neighbourhood: Rutherford    
Street Address: 5279 Rutherford - SCANNED
Type of Application: Commercial / Multi / Industrial
File Number: BP113565
Date Application Submitted: December 01, 2008
Application Description: Commercial Development - mixed use - Three - part 9 buildings, combustible construction, sprinklered with fire alarm.

Bldg. (A) 5279 Rutherford, 3 storey with 326 m2 F-2 lower floor subsidiary occupancy to office suite #100, 312 m2 offices on main level and 2 residential suites on 159m2 upper level. Inspections under BP113565.
Bldg. (B) 5275 Rutherford, 2 storey with 182 m2 offices on main floor and 2 residential suites on 126 m2 upper floor. Inspections under BP113748
Bldg. (C) REVISED 5271 Rutherford, 2 storey with 234 m2 A-2 on main 48m2 up, 1 res. suite 108.6m2 upper floor. Inspections under BP113749

Permit includes Tenant Improvement - Bldg. A - suite 100 - 5279 Rutherford main floor, 217.6m2, D occupancy and includes lower floor F-2 subsidiary occupancy with one "universal" toilet room. One "universal" and one unisex washrm on main floor.
Future permits required for commercial tenant improvements in each building.
Feb/July 2010 revision see conditions VS
Application Status: COMPLETED
Permit Value: $1,880,000.00
Builder: HEATHERBRAE RESTORATION COMPANY LTD
Issued Date: May 20, 2009
File Close Date: May 19, 2010

Associated Properties

Address Zone More
5279 RUTHERFORD ROAD CC1 Property Report
5271 RUTHERFORD ROAD CC1 Property Report
100   5275 RUTHERFORD ROAD CC1 Property Report
101   5275 RUTHERFORD ROAD CC1 Property Report
5277 RUTHERFORD ROAD CC1 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD CANCELLED
OCCUPANCY-OLD PASSED

2011-05-06

OCCUPANCY-OLD SCHEDULED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.