BP113543 - 2220 Dorman
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113543 - 2220 Dorman | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 2220 Dorman |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP113543 |
| Date Application Submitted: | November 19, 2008 |
| Application Description: |
Terasen Gas - Renovation to demise a 360m2 separate tenant space on main floor, add exits, add new and renovate washrooms and close in 30m2 interconnected floor area for meeting room on second floor. "Universal" washroom shared in common lobby. Existing 2 storey, combustible/ non-combustible building, sprinklered with fire alarm, divided by a 4 hr fire wall into 504.3 m2 office area (2006BCBC 3.2.2.56. Group D) and 349m2 shop/subsidiary office/equipment storage including open-air storage addition, (F-1 classification as per original Architect), (2006BCBC 3.2.2.65.). Existing elevator. Doreen has file Aug 27, 2009 |
| Application Status: | COMPLETED |
| Permit Value: | $330,000.00 |
| Building Area: |
30.00 M2 322.92 ft2 |
| Builder: | WINDLEY INVESTMENTS LTD |
| Issued Date: | February 17, 2009 |
| File Close Date: | August 18, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2220 DORMAN ROAD | I1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2009-08-18 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)