BP113537 - 1663 Centennary Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113537 - 1663 Centennary Drive | |
|---|---|
| Neighbourhood: | Chase River |
| Street Address: | 1663 Centennary Drive |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP113537 |
| Date Application Submitted: | November 18, 2008 |
| Application Description: |
Addition of garage/workshop with bonus room over Note: This construction brings this lot up to the Maximum Allowed Gross Floor Area of 418 Square Meters (4499 sq.ft.) |
| Application Status: | COMPLETED |
| Permit Value: | $43,320.00 |
| Building Area: |
115.12 M2 1,239.14 ft2 |
| Issued Date: | December 05, 2008 |
| File Close Date: | January 27, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1661 CENTENNARY DRIVE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
COMPLETED |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
CANCELLED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2010-01-27 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)