BP113455 - 582 Rosehill Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP113455 - 582 Rosehill Street | |
---|---|
Neighbourhood: | Townsite |
Street Address: | 582 Rosehill Street |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP113455 |
Date Application Submitted: | August 26, 2008 |
Application Description: |
Rosehill Street Development consists of 2 - 4 unit multi-family buildings, Part 9, combustible, fire alarm system, sprinklered two-storey buildings. 45 min. FRR/FS, 50 STM between units. FOR INSPECTION ONLY 582 Rosehill Street Building 1 - 174.28 m2 - main floor, 167.78 m2 - 2nd floor. 101 - 582 Rosehill - Unit 1 - 95.96 m2 GFA 102 - 582 Rosehill - Unit 2 - 91.23 m2 GFA 103 - 582 Rosehill - Unit 3 - 91.23 m2 GFA 104 - 582 Rosehill - Unit 4 - 63.64 m2 GFA |
Application Status: | COMPLETED |
Builder: | ECKLUNDSON CONSTRUCTION LTD |
Issued Date: | October 30, 2008 |
File Close Date: | December 31, 2009 |
Associated Properties
Address | Zone | More |
---|---|---|
101 582 ROSEHILL STREET | R8 | Property Report |
102 582 ROSEHILL STREET | R8 | Property Report |
103 582 ROSEHILL STREET | R8 | Property Report |
104 582 ROSEHILL STREET | R8 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
SCHEDULED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2009-06-17 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.