BP113448 - 123 Commercial St -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP113448 - 123 Commercial St -- Scanned
Neighbourhood: Downtown/Old City    
Street Address: 123 Commercial St -- Scanned
Type of Application: Commercial / Multi-Res Alteration
File Number: BP113448
Date Application Submitted: October 14, 2008
Application Description: Creating shell commercial lease spaces "B & C" (change of occupancy, from A-2 to "E"). Work includes 2hr & 3/4hr FRR/fire separation walls between occupancies and 2 hr FRR/fire separation floor/ceiling. New exterior exit doors, accessible washrooms (1 per unit approved with submitted letter from Raymond de Beeld, 2 per unit required using T3.1.17.1 & T3.7.2.2.B, BCBC 2006), a ramp, etc . for creation of leasable retail spaces (lease area's "B & C") on ground floor.
Fire alarm system being upgraded to reflect changes that are and have occurred in this building. APPROVED BY FIRE D. JAN. 19/09
Building permits required to complete and occupy lease areas.
Group "E" in existing two storey, 552.31m2, sprinklered building.
Revised plumbing schematic submitted and approved Jan. 6, 2008. AG
Revision Jan 14, 2009
- 4 new sprinkler heads,relocating 4 sprinkler heads.
- Fire alarm, exit sign and emergency light layout submitted. AG
Revision new drawings 08-11-09, JB deleted ramp.
Application Status: COMPLETED
Permit Value: $25,000.00
Builder: INTEGRITY HOME INSPECTIONS
Issued Date: November 20, 2008
File Close Date: August 13, 2009

Associated Properties

Address Zone More
123 COMMERCIAL STREET DT1 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

CANCELLED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

CANCELLED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

CANCELLED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

CANCELLED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

CANCELLED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2009-08-13

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.