BP113393 - 600 Miller Farm Drive (parent) 3284 /3286 Mercedes Way -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP113393 - 600 Miller Farm Drive (parent) 3284 /3286 Mercedes Way -- Scanned | |
---|---|
Neighbourhood: | Linley Valley |
Street Address: | 600 Miller Farm Drive (parent) 3284 /3286 Mercedes Way -- Scanned |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP113393 |
Date Application Submitted: | June 26, 2008 |
Application Description: |
Miller Farm - 10 unit sprinklered Multi-family development - Phase 1 Mercedes Way - 372.9 m2 duplex - Call for inspections under BP113393 3286 Mercedes Way - 186.45 m2 gross floor area + 34.09 m2 garage 3284 Mercedes Way - 186.45 m2 gross floor area + 34.09 m2 garage |
Application Status: | COMPLETED |
Builder: | NOTTINGHAM PROPERTIES LTD |
Issued Date: | June 19, 2009 |
File Close Date: | March 07, 2011 |
Associated Properties
Address | Zone | More |
---|---|---|
3286 MERCEDES WAY | R10 | Property Report |
3284 MERCEDES WAY | R10 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2011-03-07 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.