BP113380 - 530 Fifth -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113380 - 530 Fifth -- Scanned | |
|---|---|
| Neighbourhood: | University District |
| Street Address: | 530 Fifth -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP113380 |
| Date Application Submitted: | September 19, 2008 |
| Application Description: |
University Village, 1 storey commercial building - reno and addition to Building A - Phase 3 Renovation to existing Quality Foods and Harbour City Bingo. Upgrade demising wall between Quality Foods and Harbour City Bingo. Accessible washroom added to CRU-A5. Separate permits required to complete and occupy CRU-A1 to CRU-A5 , and for signage. Building Classification: BCBC2006, 3.2.2.57. "E", sprinklered with fire alarm system, non-combustible construction, 6681.55m2 Fire safety plan by Urban Design Group. |
| Application Status: | COMPLETED |
| Permit Value: | $1,350,000.00 |
| Builder: | CAPO CONSTRUCTION INCORPORATED |
| Issued Date: | August 05, 2009 |
| File Close Date: | December 20, 2011 |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2011-12-20 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)