BP113375 - #4A (Cash Store) - 6338 Metral - Bldg C - 6334 Metral (parent)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113375 - #4A (Cash Store) - 6338 Metral - Bldg C - 6334 Metral (parent) | |
|---|---|
| Neighbourhood: | Pleasant Valley |
| Street Address: | #4A (Cash Store) - 6338 Metral - Bldg C - 6334 Metral (parent) |
| Type of Application: | Leasehold Improvements |
| File Number: | BP113375 |
| Date Application Submitted: | September 18, 2008 |
| Application Description: |
The Cash Store - Tenant Improvement Permit (4A - 6338 Metral Drive) - Work includes adding 1 accessible washroom, counter with accessible gate, new 1hr FRR/FS demising wall (minimum 3/4 FRR/FS required) and interior partition walls. Building area = 89.19m2, Group D, One storey, 3.2.2.27, Sprinklered, Accessible, Fire alarm. Permit for Unit 4A only, unit 4B will require separate permit(s) to finish and occupy. All site servicing, landscaping, sprinklers, building shell and foundation are under BP111933 6338 Metral Drive - Building C = Shell Building only - 2 & 1 hr FRR/FS demising walls for 6 CRU's (1 more has been created, unit 4 has been divided into 4A/4B), Future permits required to complete CRU'S; Building area = 1019 m2, Group A2 & Group E, One storey, 3.2.2.27, Sprinklered, combustible const. OK, Accessible, Fire alarm. Physical File Scanned + attached Feb 24, 2009 db |
| Application Status: | COMPLETED |
| Permit Value: | $35,000.00 |
| Building Area: |
89.19 M2 960.03 ft2 |
| Builder: | PALLADIAN DEVELOPMENTS INC |
| Issued Date: | November 24, 2008 |
| File Close Date: | February 11, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6334 METRAL DRIVE | CC4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2009-02-12 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)