BP113179 - 5183 Cougar Trail
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113179 - 5183 Cougar Trail | |
|---|---|
| Neighbourhood: | Rutherford | 
| Street Address: | 5183 Cougar Trail | 
| Type of Application: | Single / Two Family Dwelling | 
| File Number: | BP113179 | 
| Date Application Submitted: | July 17, 2008 | 
| Application Description: | For construction of an on slab single family dwelling with walk out basement suite complete with two car garage Revision November 07, 2008..... Relocate some walls in suite area to make it one bedroom. Change suite entry door location. Change original suite entry location to a 4-o X 4-o window Add two piece bath in basement of main dwelling,Delete deck and roof off of dining room, change Dining room doors to Sliding glass doors. Reshape coat closet in main foyer with two outswing doors. Change island configuration in Kitchen. Delete part of front porch and roof. Change bedroom #3 French Doors to 5-o X 5-o window. | 
| Application Status: | COMPLETED | 
| Permit Value: | $249,253.00 | 
| Building Area: | 3,335.00 M2 35,897.61 ft2 | 
| Issued Date: | July 29, 2008 | 
| File Close Date: | February 03, 2009 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 5183 COUGAR TRAIL ROAD | R5 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| FOOTING / FORMS Inspection of forms prior to any concrete being poured | PASSED | 
| PERIMETER DRAIN For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering | PASSED | 
| UNDERSLAB PLUMBING Complete underslab plumbing must be visible | PASSED | 
| STORM CONNECTION Pipe and Connection must be visible for inspection | PASSED | 
| SANITARY CONNECTION Pipe and Connection must be visible for inspection | PASSED | 
| WATER CONNECTION Pipe and Connection must be visable for inspection | PASSED | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping | PASSED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PASSED | 
| FRAMING Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection | PASSED | 
| OCCUPANCY-OLD Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish | FAILED | 
| OCCUPANCY-OLD Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish | PASSED 2009-02-03 | 
| Map | 
|---|
|  View in Google Earth (KML) | 
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        

