Application Description: |
TRIED TO CONTACT BY PHONE SEE EVENTS... For construction of a one storey single family dwelling on a crawl space complete with a two car garage. Revision Nov 24/08 -add sink in garage. MV Revision December 10, 2008 Add gas F/P to Master BR.Enlarge Master Bath shower to 48x72. Enlarge main bath window to 5-0 X 5-6. Build small service room in garage area to accomodate tankless HWT instead of conventional HWT. 3-0x6-8 entry door to garage. Change door from DR to exterior to 3-0x6-8 Add 2-0x5-0 window to MasterBR. Add 15"x20" window to Master BR closet. Alter window configuration in dining room and great room facing back yard. MLB Dec 10, 2008 - Original issuance was Aug 13/08 - permit was unissued due to revisions. Fee's must be paid prior to re - issuance. *note* Enter Aug 13/08 when paid. See TW for clarification. Revision submitted April 3, 2009 - adding approx. 27' X 19' free standing deck at rear. |
Application Status: | COMPLETED |
Permit Value: | $227,629.00 |
Building Area: |
2,380.00 M2 25,618.08 ft2 |
Builder: | 679378 BC LTD DBA MILLCREEK HOMES |
Issued Date: | August 13, 2008 |
File Close Date: | April 16, 2009 |
Associated Properties
Address | Zone | More |
---|---|---|
3506 CASTLE ROCK DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
COVENANT PREPARATION
type covenant, applicant to sign, city to notorize. Completed means that the covenant is ready to send to LTO. Completed status will create the task to track LTO registation |
COMPLETED |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2009-04-16 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.