BP113074 - 2506 Bowen Road - (NEW alias address = 2270 Labieux) new parent 2290 Labieux
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP113074 - 2506 Bowen Road - (NEW alias address = 2270 Labieux) new parent 2290 Labieux | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 2506 Bowen Road - (NEW alias address = 2270 Labieux) new parent 2290 Labieux |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP113074 |
Date Application Submitted: | June 26, 2008 |
Application Description: |
2270 Labieux Road = Offices for "Haven Society: Promoting The Safety of Women, Children, Youth and Families." - Part 9 , Group D, Two storeys with partial basement, crawl space, sprinklered , fire alarm, combustible. Basement = 88.16 m2., single exit, 1st storey = 315.31 m2, Two exits, 2nd storey = 286.88 m2., single exit, 45 min. FRR/FS for Floor assemblies and loadbearing supports. Exits, Service spaces. Note - convenience stair at front of building. 45 min. FRR/FS between basement and Crawl space. Crawl space no rating for the floor above, post "No Occupancy/Storage" sign in crawl space. x reference BP113864 for the FOUNDATION PERMIT Nov. 30, 09 address change, parent address 2290 Labieux |
Application Status: | COMPLETED |
Permit Value: | $900,000.00 |
Builder: | ISLAND WEST COAST DEVELOPMENTS |
Issued Date: | April 22, 2009 |
File Close Date: | February 10, 2010 |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2010-02-10 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.