BP113064 - 4777 Island Hwy
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113064 - 4777 Island Hwy | |
|---|---|
| Neighbourhood: | Diver Lake |
| Street Address: | 4777 Island Hwy |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP113064 |
| Date Application Submitted: | June 26, 2008 |
| Application Description: |
New Building - Galaxy Motors car dealership with residential suite above. Building Classification: Part 9, 188.6m2, two storey, "E" retail main floor, "C" residential, 68.3m2, 2nd floor, occupancy separation at floor assembly 1hr Fire Separation with 1hr FRR for the supports, sprinklered with a fire alarm system. Combustible construction. Group C - Residential Caretaker Suite on Second Floor. (68.3 m2) Sprinklered with fire alarm system. |
| Application Status: | COMPLETED |
| Permit Value: | $721,000.00 |
| Builder: | WINDLEY CONTRACTING LTD |
| Issued Date: | September 25, 2008 |
| File Close Date: | February 26, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 4777 ISLAND HIGHWAY N | COR3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
CANCELLED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2009-02-26 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)