BP113056 - 2137 Boundary
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113056 - 2137 Boundary | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 2137 Boundary |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP113056 |
| Date Application Submitted: | June 25, 2008 |
| Application Description: |
Legalize triplex, install sprinkler system, upgrade fire separations, and misc. work. All the plumbing is existing under the original building permit except for 3 fixtures including the lower floor washroom with one toilet and sink and the lower floor kitchen sink. Civil engineering includes upgraded water service and new fire hydrant. Part 9 building with C Occupancy. 368.6 sq m 2 storey. The first storey is 184 sq m with 92 sq m common area including laundry, storage, office, and service rooms and a 92 sq m dwelling unit. The second storey is 184 sq m. with two 92 sq m dwelling units. Physical File Scanned + attached May 11, 2009 db |
| Application Status: | COMPLETED |
| Permit Value: | $10,000.00 |
| Issued Date: | September 11, 2008 |
| File Close Date: | April 27, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2137 BOUNDARY AVENUE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2009-04-27 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.