BP113032 - 2377 Cienar
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113032 - 2377 Cienar | |
|---|---|
| Neighbourhood: | Diver Lake |
| Street Address: | 2377 Cienar |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP113032 |
| Date Application Submitted: | June 17, 2008 |
| Application Description: |
Houle Electric - One storey 599.22m2 office/warehouse building with 73.7m2 mezzanine. Complete interior renovation (only exterior walls and interior posts existing). Work includes 73.7m2 mezzanine with 1hr demising wall provided ,no mezz. floor rating required, interior partitions, mens washroom, womens washroom, universal washroom, 2 piece washroom in subsidiary warehouse area, two exterior canopies and seismic upgrade. Building Classification: Part 9, "F-2" (subsidiary), "D" occupancies, one storey with mezzanine, combustible and non-combustible construction, sprinklered with fire alarm system. Existing building permit (BP027376) issued for a F-2 Class Building with a D Class Subsidiary, unsprinklered with no mezzanine |
| Application Status: | COMPLETED |
| Permit Value: | $450,000.00 |
| Building Area: |
672.92 M2 7,243.24 ft2 |
| Builder: | H E L INVESTMENTS LTD |
| Issued Date: | July 11, 2008 |
| File Close Date: | September 29, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2377 CIENAR DRIVE | I2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2009-09-29 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)