BP112913 - 2109 Meredith - future address 2111 Meredith
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112913 - 2109 Meredith - future address 2111 Meredith | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 2109 Meredith - future address 2111 Meredith |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112913 |
| Date Application Submitted: | May 20, 2009 |
| Application Description: |
2111 Meredith Road - Multi-residential Development - Phase 2 (Building C), 30 Unit, Four storey wood frame residential, Group C , Sprinklered with fire alarm. First storey (building area per BCBC) = 838 m2, 2nd storey = 836.82 m2, 3rd storey = 836.82 m2, 4th storey = 664.37 m2. Total Area = 3,176.01 m2 Building Classification: 3.2.2.45, Combustible or non-combustible construction, 1 hr FS/FRR, for floor assemblies and 1 hr FRR load bearing supports, Roof 1 hr FRR/FS (req'd as vertical FS walls extend through to the underside of the roof sheathing. 1 hr. FS/FRR, 50 STM between the residential suites and remainder of the building. 1-hr. FS/FRR to public corridors. 1.0 hr FS, duct shafts through residential 45min FS, exterior balconies no rating, Ducts shafts through common attic 1hr FS. Accessible to building entrance and from parking area. Stairs, guards and ramps to comply with BCBC |
| Application Status: | COMPLETED |
| Permit Value: | $2,651,885.00 |
| Builder: | REGA PROPERTIES LTD |
| Issued Date: | March 09, 2010 |
| File Close Date: | January 26, 2011 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 402 2111 MEREDITH ROAD | COR1 | Property Report |
| 403 2111 MEREDITH ROAD | COR1 | Property Report |
| 404 2111 MEREDITH ROAD | COR1 | Property Report |
| 405 2111 MEREDITH ROAD | COR1 | Property Report |
| 406 2111 MEREDITH ROAD | COR1 | Property Report |
| 304 2111 MEREDITH ROAD | COR1 | Property Report |
| 305 2111 MEREDITH ROAD | COR1 | Property Report |
| 306 2111 MEREDITH ROAD | COR1 | Property Report |
| 307 2111 MEREDITH ROAD | COR1 | Property Report |
| 308 2111 MEREDITH ROAD | COR1 | Property Report |
| 401 2111 MEREDITH ROAD | COR1 | Property Report |
| 206 2111 MEREDITH ROAD | COR1 | Property Report |
| 207 2111 MEREDITH ROAD | COR1 | Property Report |
| 208 2111 MEREDITH ROAD | COR1 | Property Report |
| 301 2111 MEREDITH ROAD | COR1 | Property Report |
| 302 2111 MEREDITH ROAD | COR1 | Property Report |
| 303 2111 MEREDITH ROAD | COR1 | Property Report |
| 108 2111 MEREDITH ROAD | COR1 | Property Report |
| 201 2111 MEREDITH ROAD | COR1 | Property Report |
| 202 2111 MEREDITH ROAD | COR1 | Property Report |
| 203 2111 MEREDITH ROAD | COR1 | Property Report |
| 204 2111 MEREDITH ROAD | COR1 | Property Report |
| 205 2111 MEREDITH ROAD | COR1 | Property Report |
| 102 2111 MEREDITH ROAD | COR1 | Property Report |
| 103 2111 MEREDITH ROAD | COR1 | Property Report |
| 104 2111 MEREDITH ROAD | COR1 | Property Report |
| 105 2111 MEREDITH ROAD | COR1 | Property Report |
| 106 2111 MEREDITH ROAD | COR1 | Property Report |
| 107 2111 MEREDITH ROAD | COR1 | Property Report |
| 101 2111 MEREDITH ROAD | COR1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2011-01-26 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)