BP112903 - 5670 Edgewater 4825 Uplands(parent) -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112903 - 5670 Edgewater 4825 Uplands(parent) -- Scanned | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 5670 Edgewater 4825 Uplands(parent) -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112903 |
| Date Application Submitted: | May 15, 2008 |
| Application Description: |
Thornbridge at Longwood -x reference BP 112979 foundation. 64 unit, Four storey wood frame residential Group C with concrete underground (basement) parking, Group F3, Sprinklered with fire alarm. Underground parking area = 2495.37m2, 1st storey = 1696.5 m2, 2nd storey = 1626.2 m2, 3rd storey = 1626.2m2, 4th storey = 1592.3 m2. Building Classification: 3.2.2.45, Combustible construction, 1 hr FS/FRR, for floor assemblies and 1 hr FRR load bearing supports, Roof 1 hr FRR/FS (req'd as vertical FS walls do not extend through the attic), 1.5 hr between the storage garage and other occupancies. 1 hr. FS/FRR, 50 STM between the residential suites and remainder of building. 1-hr. FS/FRR public corridors. 1.0 hr FS, duct shafts through residential 45min FS, exterior balconies no rating, Ducts shafts through common attic 1hr FS. Accessible to building entrance and from parking area. Stairs, guards and ramps to comply with BCBC. Sprinkler drawings received on Sept. 9, 2008. |
| Application Status: | COMPLETED |
| Permit Value: | $8,579,960.00 |
| Builder: | KNAPPETT PROJECTS INC |
| Issued Date: | July 23, 2008 |
| File Close Date: | June 10, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 417 5670 EDGEWATER LANE | R1 , R8 | Property Report |
| 4825 UPLANDS DRIVE | COR1 , R8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2010-06-10 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)