BP112900 - 4600 Hammond Bay (existing) - 4670 McGuffie Road for New Operations Building

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP112900 - 4600 Hammond Bay (existing) - 4670 McGuffie Road for New Operations Building
Neighbourhood: Hammond Bay    
Street Address: 4600 Hammond Bay (existing) - 4670 McGuffie Road for New Operations Building
Type of Application: Commercial / Multi / Industrial
File Number: BP112900
Date Application Submitted: May 15, 2008
Application Description: Waste Water Treatment Facility.
This permit includes the New Operations Building and Renovations to the existing Operations building and Renovations to the boiler building.

Alias Address - 4670 McGuffie Road for New Operations Building. X-reference bp113368 for the foundation permit.
Building area = 251.54 m2, Part 9 Building, One storey Sprinklered, accessible. Group D, Two exits provided. Ramp for persons with disabilities to front door. Washroom facility provided, one accessible toilet room for persons with disabilities.

and
Existing Operations Building Renovation, Part 9 Building, 2 stories, from architects area = 105.3 m2, 1st storey,134.6 m2 2nd storey, unsprinklered, Upgrading the exit to 45 min FRR/FS and adding accessible ramp to the front entrance.

Boiler Building Renovation, Part 9 Building, unsprinklered
Application Status: COMPLETED
Permit Value: $1,077,000.00
Builder: REGIONAL DISTRICT OF NANAIMO
Issued Date: October 14, 2008
File Close Date: August 05, 2009

Process Steps

Task Status
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2009-08-05

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.