BP112872 - 67 Valdes Place
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112872 - 67 Valdes Place | |
|---|---|
| Neighbourhood: | Newcastle/Brechin |
| Street Address: | 67 Valdes Place |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP112872 |
| Date Application Submitted: | May 08, 2008 |
| Application Description: |
Approx 8 x 10 foot front entrance addition; 8 x 8 foot left-side deck addition; 8 x 20 foot and 8 x 12 foot rear deck additions; and convert existing bedroom to office / ensuite. Revision submitted Oct.28, 2008 - Changed pad footings to 24"x 6" footing and 8" footing wall for rear deck. AG Revision submitted Nov.13, 2008 - Adding 6' entrance cover - Removing front and right side windows AG |
| Application Status: | COMPLETED |
| Permit Value: | $35,000.00 |
| Building Area: |
7.43 M2 79.98 ft2 |
| Issued Date: | June 04, 2008 |
| File Close Date: | November 17, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 67 VALDES PLACE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
COMPLETED |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2010-11-17 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)