BP112839 - 6177 Dennie Lane
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112839 - 6177 Dennie Lane | |
|---|---|
| Neighbourhood: | Pleasant Valley |
| Street Address: | 6177 Dennie Lane |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP112839 |
| Date Application Submitted: | May 02, 2008 |
| Application Description: |
Construct a one storey single family dwelling on crawlspace with attached double garage. Revision - Sept 22/08 1) move bathroom walls on main bath 2) add stairs between garage/house and at front of house 3) change tub in ensuite to 32x60 shower and eliminate original shower BCLS Certificate of Location attached db |
| Application Status: | COMPLETED |
| Permit Value: | $195,000.00 |
| Building Area: |
140.47 M2 1,512.01 ft2 |
| Issued Date: | May 26, 2008 |
| File Close Date: | February 20, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6177 DENNIE LANE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
FAILED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
FAILED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
FAILED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
FAILED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2009-02-20 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)