BP112818 - 6334 Metral - Main - Bldg B1 + Inspections for 6332 Metral
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112818 - 6334 Metral - Main - Bldg B1 + Inspections for 6332 Metral | |
|---|---|
| Neighbourhood: | Pleasant Valley |
| Street Address: | 6334 Metral - Main - Bldg B1 + Inspections for 6332 Metral |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112818 |
| Date Application Submitted: | April 29, 2008 |
| Application Description: |
Metral Station Shopping Centre - 2 buildings (Shell Buildings), Future permits required for the tenants improvements xreference bp112897 for the foundation permit. 6332 Metral Drive - Building B1 - 239 m2 - Group E - Part 9 or 3.2.2.62, sprinklered , fire alarm, Providing 1 hr FRR/FS demising wall to be continuous to the underside of the roof deck, 1 hr FRR/FS for mechanical rooms. West and East exposed building face = 1 hr FRR. Tenant improvement permits are required. 6336 Metral Drive - Building B2 - 158 m2 - Group A2 - Future Starbuck's - 3.2.2.27, Sprinklered, Fire alarm Tenant improvement permits are required INSPECTIONS FOR 6332 METRAL UNDER THIS PERMIT INSPECTIONS FOR 6336 METRAL UNDER BP113006 Physical File Scanned + attached Feb 26, 2009 db |
| Application Status: | COMPLETED |
| Permit Value: | $760,000.00 |
| Builder: | NORSON CONSTRUCTION LTD |
| Issued Date: | June 13, 2008 |
| File Close Date: | December 05, 2008 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6334 METRAL DRIVE | CC4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
| OCCUPANCY-OLD | FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2008-12-05 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)