BP112753 - 3347 & 3349 Mariposa Drive - SCANNED

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP112753 - 3347 & 3349 Mariposa Drive - SCANNED
Neighbourhood: Linley Valley    
Street Address: 3347 & 3349 Mariposa Drive - SCANNED
Type of Application: Commercial / Multi / Industrial
File Number: BP112753
Date Application Submitted: February 29, 2008
Application Description: (Phase 3) Duplex A: Two storey, crawl space, sprinklered.
3401 Barrington (parent)
3349 Mariposa Drive SL 27: Unit 27 -179.3m2, attached garage 34.8m2
3347 Mariposa Drive SL 28: Unit 28 -179.3m2, attached garage 34.8m2
Nominal floor system, inspections under BP112753
INSPECTIONS ONLY



Application Status: COMPLETED
Builder: 447223 BC LTD
Issued Date: August 29, 2008
File Close Date: October 15, 2009

Associated Properties

Address Zone More
3349 MARIPOSA DRIVE R6 Property Report
3347 MARIPOSA DRIVE R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2009-10-15

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.