BP112672 - 639 Seventh (parent) 813 Oakhills Vista Phase 8 SL23-23, VIS6562 Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112672 - 639 Seventh (parent) 813 Oakhills Vista Phase 8 SL23-23, VIS6562 Scanned | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 639 Seventh (parent) 813 Oakhills Vista Phase 8 SL23-23, VIS6562 Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112672 |
| Date Application Submitted: | March 10, 2010 |
| Application Description: |
Oakhills Vista - 27 unit multi-family site - Phase 8 - 1 Duplex unit. Units 22 & 23 are two storey, sprinklered single family dwellings with attached unsprinklered single garages. 3/4 hr fire resistance rating required on portions of the building face closer than 1.2 m to the centerline between buildings. Unit 22 -- 813 Oakhills Vista -- 180.69m2 + 28.97m2 Garage, inspections under this permit Unit 23 -- 813 Oakhills Vista --180.69m2 + 28.97m2 Garage, inspections under this permit |
| Application Status: | COMPLETED |
| Permit Value: | $380,000.00 |
| Builder: | OAKHILLS VISTA DEVELOPMENTS LTD |
| Issued Date: | March 11, 2010 |
| File Close Date: | September 30, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 100 813 OAKHILLS VISTA | R6 | Property Report |
| 110 813 OAKHILLS VISTA | R6 | Property Report |
| 625 SEVENTH STREET | R6 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
| OCCUPANCY-OLD | CANCELLED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2010-09-30 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)