BP112671 - 639 Seventh (parent) 807 Oakhills Vista Phase 6 SL16,17 VIS6562 - Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP112671 - 639 Seventh (parent) 807 Oakhills Vista Phase 6 SL16,17 VIS6562 - Drawings Scanned/Attached
Neighbourhood: Harewood    
Street Address: 639 Seventh (parent) 807 Oakhills Vista Phase 6 SL16,17 VIS6562 - Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP112671
Date Application Submitted: March 27, 2008
Application Description: Oakhills Vista - 27 unit multi-family site - Phase 6 main file for 1 Duplex unit. Units 16 & 17 are two storey, sprinklered single family dwellings with attached unsprinklered single garages. 3/4 hr fire resistance rating required on portions of the building face closer than 1.2 m to the centerline between buildings.

Cross reference BP111080 for On-Site Service Permit.

Unit 16 -- 807 Oakhills Vista -- 180.69m2 + 28.97m2 Garage, inspections under this permit
Unit 17 -- 807 Oakhills Vista --180.69m2 + 28.97m2 Garage, inspections under this permit


Building 1 BP112671 #100/110 - 807 Oakhills Vista

Revisions:
added electrical room
deleted window to garage
sprinklers required in electrical room
changed floor system to 2 x 10
12/08/09 KM
Application Status: COMPLETED
Permit Value: $380,000.00
Builder: OAKHILLS VISTA DEVELOPMENTS LTD
Issued Date: June 26, 2009
File Close Date: February 25, 2010

Associated Properties

Address Zone More
100   807 OAKHILLS VISTA R6 Property Report
110   807 OAKHILLS VISTA R6 Property Report
625 SEVENTH STREET R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

CANCELLED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2010-02-25

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.