BP112599 - 2374 Mill Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112599 - 2374 Mill Road | |
|---|---|
| Neighbourhood: | Westwood |
| Street Address: | 2374 Mill Road |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP112599 |
| Date Application Submitted: | March 07, 2008 |
| Application Description: |
Construct a log addition (on a crawlspace) to an existing single family dwelling. Revision submitted May 5, 2008 - Changed footing and floor joist design (eng. sealed design attached to plans). AG Physical File Scanned + attached Jun 22, 2009 db BCLS Certificate of Location attached Jun 22, 2009 db |
| Application Status: | COMPLETED |
| Permit Value: | $205,576.06 |
| Building Area: |
139.54 M2 1,501.99 ft2 |
| Builder: | NORSE LOG HOMES |
| Issued Date: | April 25, 2008 |
| File Close Date: | January 26, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2374 MILL ROAD | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2009-01-26 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)