BP112591 - 6596 Applecross -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112591 - 6596 Applecross -- Scanned | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 6596 Applecross -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112591 |
| Date Application Submitted: | March 06, 2008 |
| Application Description: |
3 Bldgs, One storey - Future permits for the tenants. See BP112676 for On Site servicing. Bldg A:(Shell) - 6582 Applecross - 408.76 m2 - Group A2- 3.2.2.27, Sprinklered, Fire Alarm. Combustible. Inspections this permit. Bldg B: 6588 Applecross - 487.73 m2 - Group D - 3.2.2.56.or Part 9 , Sprinklered, Fire alarm, combustible. LD on South PL = 2.464 m. (for consideration of having combustible eave) 1 hr. FRR/FS between service rooms and suites.45 min FRR/FS roof assembly.45 min FRR for South wall face. Inspections under BP112592 Bldg C: - 6596 Applecross - 1493.46 m2 - Group E/A2 - 3.2.2.27/ 3.2.2.62, Sprinklered, Fire Alarm, combustible, N & E exposed walls face 1 hr FRR, Suite separation = 45 min. FRR/FS to underside of 45 min. FRR/FS Roof Assembly and 2 hr. FRR/FS to roof sheathing (by alternative solution (GHL) between A2 (Pho Boi) and adjacent occupancies. 1 hr FRR/FS for service rooms, Inspections under BP112593 |
| Application Status: | COMPLETED |
| Permit Value: | $1,800,000.00 |
| Builder: | GEORGIA VIEW VILLAGE LTD |
| Issued Date: | June 16, 2008 |
| File Close Date: | August 04, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6596 APPLECROSS ROAD | CC4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
| OCCUPANCY-OLD | CANCELLED |
| OCCUPANCY-OLD | FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2010-07-27 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)