BP112578 - 98 Timberview Drive

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP112578 - 98 Timberview Drive
Neighbourhood: Westwood    
Street Address: 98 Timberview Drive
Type of Application: Single / Two Family Alteration
File Number: BP112578
Date Application Submitted: March 04, 2008
Application Description: 21' x 15' game room addition to existing detached garage

Approved BOV00433 for increasing maximum size of a accessory building to 79.43 square metres (855 square feet).

Revision submitted April 28, 2008
- Adding artificial stone along the bottom. AG

Physical File Scanned + attached Jul 10, 2009 db

BCLS Certificate of Location attached Jul 10, 2009 db
Application Status: COMPLETED
Permit Value: $10,000.00
Building Area: 29.26 M2
314.95 ft2
Issued Date: March 26, 2008
File Close Date: July 23, 2008

Associated Properties

Address Zone More
98 TIMBER VIEW DRIVE R5 Property Report

Process Steps

Task Status
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

COMPLETED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2008-07-23

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.