BP112567 - 3323 & 3325 Fireweed Way - SCANNED
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112567 - 3323 & 3325 Fireweed Way - SCANNED | |
|---|---|
| Neighbourhood: | Linley Valley |
| Street Address: | 3323 & 3325 Fireweed Way - SCANNED |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112567 |
| Date Application Submitted: | February 29, 2008 |
| Application Description: |
(Phase 3) 4 Duplexes Duplex A: Two storey, walk out basement, crawl space, sprinklered. 3325 Fireweed Way SL 25: Unit 25 -144.18m2, attached garage 34.75m2 3323 Fireweed Way SL 26: Unit 26 -144.18m2, attached garage 34.75m2 Engineered floor system, inspections under this permit BP112567 Duplex A: Two storey, crawl space,sprinklered. 3349 Mariposa: Unit 27 -179.3m2, attached garage 34.8m2 3347 Mariposa: Unit 28 -179.3m2, attached garage 34.8m2 Nominal floor system, inspections under BP112753 Duplex B: two storey, crawl space, sprinklered 3345 Mariposa: Unit 29 -143.44m2,attached garage 37.75m2 3343 Mariposa: Unit 30 -143.44m2,attached garage 37.75m2 Engineered floor system, inspections under BP112754 Duplex B: two storey, crawl space, sprinklered 3341 Mariposa: Unit 31 -143.44m2,attached garage 37.75m2 3339 Mariposa: Unit 32 -143.44m2, attached garage 37.75m2 Engineered floor system, inspections under bp 112755 Revisions:KM Change 2x12 to 2x10 |
| Application Status: | COMPLETED |
| Permit Value: | $1,040,000.00 |
| Builder: | 447223 BC LTD |
| Issued Date: | August 29, 2008 |
| File Close Date: | October 15, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 3325 FIREWEED WAY | R6 | Property Report |
| 3323 FIREWEED WAY | R6 | Property Report |
| 3339 MARIPOSA DRIVE | R6 | Property Report |
| 3349 MARIPOSA DRIVE | R6 | Property Report |
| 3347 MARIPOSA DRIVE | R6 | Property Report |
| 3345 MARIPOSA DRIVE | R6 | Property Report |
| 3343 MARIPOSA DRIVE | R6 | Property Report |
| 3341 MARIPOSA DRIVE | R6 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
| OCCUPANCY-OLD |
PASSED
2009-10-15 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)