BP112558 - 6156 McGirr (Parent)6211 Lexington Place SL19_20 VIS6730 -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112558 - 6156 McGirr (Parent)6211 Lexington Place SL19_20 VIS6730 -- Scanned | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 6156 McGirr (Parent)6211 Lexington Place SL19_20 VIS6730 -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112558 |
| Date Application Submitted: | January 08, 2008 |
| Application Description: |
Lexington Place - Phase 2 of 3 Phase Multi-Family (30 Units/15 Buildings) Site servicing under BP112393 INSPECTION TASKS ONLY for Building 5 -- 6211 Lexington Place Units E19/E20 Changes completed: Changed layout to lower floor by adding walls to furnace room and a bedroom. 10/26/10 KM |
| Application Status: | COMPLETED |
| Permit Value: | $100.00 |
| Builder: | 0784448 BC LTD |
| Builder: | DON SAYWELL DEV LTD |
| Issued Date: | April 16, 2008 |
| File Close Date: | January 25, 2012 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 101 6211 LEXINGTON PLACE | R6 | Property Report |
| 102 6211 LEXINGTON PLACE | R6 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
| OCCUPANCY-OLD |
PASSED
2012-01-25 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)