Search Again| BP112534 - 102 2520 Bowen | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 102 2520 Bowen |
| Type of Application: | Leasehold Improvements |
| File Number: | BP112534 |
| Date Application Submitted: | February 25, 2008 |
| Application Description: |
Jacuzzi Store " The Soakhouse" Type E retail store. Construct new mezzanine 98.17 m2 Main floor area is 380 m2. Main floor consists of a showroom, a moon room (2nd showroom), a water testing room, a storage room (c/w a washer/dryer), employee bathroom, accessible washroom and a change room. Sprinklers added and modified at lower level and below mezzanine. Two storey 3391.59m2 (main floor 3391.59m2, 2nd floor 1240.68m2) existing building reclassified under BCBC 1998 - 3.2.2.60. Group E (lower) & D (upper) major occupancies, up to 3 storeys sprinklered with fire alarm, combustible or non-combustible construction, 45min. fire separation for floors. 45min. FRR for mezzanines and loadbearing supports if of combustible material. Physical File Scanned + attached Aug 14, 2008 db |
| Application Status: | COMPLETED |
| Permit Value: | $80,000.00 |
| Building Area: |
478.18 M2 5,147.08 ft2 |
| Builder: | GREEN COAST CONTRACTING |
| Issued Date: | April 17, 2008 |
| File Close Date: | June 19, 2008 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2520 BOWEN ROAD | I2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured for footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2008-06-19 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)