BP112529 - 722 Bowman
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112529 - 722 Bowman | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 722 Bowman |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP112529 |
| Date Application Submitted: | February 22, 2008 |
| Application Description: |
For the Construction of a two storey addition to an existing two storey single family dwelling on a crawl space with detached garage. REVISION October 06, 2008. Change footings to 16 " from 24" and foundation from 8" to 6" Delete the walkin closet and create a 5'by 2' closet in lieu of. Change inswing exterior doors to outswing doors. MLB CLARIFICATION Oct 16, 2008. Geotech report confirms requirement of footings to be at least 18" below grade. (See page six of approved plans showing section drawing. Insulation is shown to be 20 inches below grade, This drawing would indicate a footing of at least 26" below grade). Compliance with Section 9.12.2 of the B.C. Building Code requires Footings to be below local frost conditions. Nanaimo's local conditions dictate a minimum of 18". REVISION January 21,2009. Change covered deck to storage/ freezer room with exterior stairs parallel to house. Physical File Scanned + attached May 7, 2009 db |
| Application Status: | COMPLETED |
| Permit Value: | $52,557.00 |
| Building Area: |
53.50 M2 575.87 ft2 |
| Issued Date: | September 11, 2008 |
| File Close Date: | May 05, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 722 BOWMAN AVENUE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
CANCELLED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2009-05-05 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)