BP112520 - 510 Fifth University Village - Building B - Phase 2 - parent 530 Fifth
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112520 - 510 Fifth University Village - Building B - Phase 2 - parent 530 Fifth | |
|---|---|
| Neighbourhood: | University District |
| Street Address: | 510 Fifth University Village - Building B - Phase 2 - parent 530 Fifth |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112520 |
| Date Application Submitted: | February 19, 2008 |
| Application Description: |
510 Fifth University Village - Building B - Phase 2 - parent 530 Fifth University Village - Building B - Phase 2 - 1994.4m2 one storey, non-combustible, commercial building shell for future Shoppers Drug Mart and future medical office. Separate permits required to complete and occupy and for signage. West wall face 2 hr, non-combustible cladding for spatial separation. Permit includes underslab plumbing and demising wall (3/4 hr required, 1 hr supplied) Building Classification: BCBC2006, 3.2.2.62. "E", sprinklered with fire alarm system, combustible or non-combustible construction, 45 min. FS for floor assemblies. Fire Suppression Engineer: G.E. Johnston, Schedule B1, B2 & drawings retracted Aug. 1,08. New Schedules and design submitted from N. Ardashirov, PEng. VS BCLS Certificate of Location attached Dec 29, 2008 db see other attachments ie Field Reports + Schedules Dec 29, 2008 db Physical File Scanned + attached Feb 6, 2008 db |
| Application Status: | COMPLETED |
| Permit Value: | $1,700,000.00 |
| Builder: | CAPO CONSTRUCTION |
| Issued Date: | June 17, 2008 |
| File Close Date: | January 08, 2009 |
Process Steps
| Task | Status |
|---|---|
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2009-01-08 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)