BP112496 - 545 Brechin Rd
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112496 - 545 Brechin Rd | |
|---|---|
| Neighbourhood: | Newcastle/Brechin |
| Street Address: | 545 Brechin Rd |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP112496 |
| Date Application Submitted: | February 12, 2008 |
| Application Description: |
9 x 23 ft addition for bedroom and living room over unfinished basement to right side of existing single family dwelling, remove existing roof and add third storey living space. REVISION July 20, 2011. Add a dormer to roof. Add a three piece bath next to music room. MLB. Revision Aug. 5, 2011: - adding beam between stairwell and living room - extending stairwell 1'- 0" AG |
| Application Status: | COMPLETED |
| Permit Value: | $55,990.52 |
| Building Area: |
93.18 M2 1,002.98 ft2 |
| Issued Date: | July 24, 2009 |
| File Close Date: | April 02, 2014 |
| Expiry Date: | July 24, 2013 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 545 BRECHIN ROAD | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
CANCELLED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
SCHEDULED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2014-04-02 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)