BP112445 - 325 Hecate -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112445 - 325 Hecate -- Scanned | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 325 Hecate -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112445 |
| Date Application Submitted: | January 25, 2008 |
| Application Description: |
Oak Tree Manor 66 units Senior's Rental Residential Bldg 4 Storey, Combustible,sprinklered to NFPA 13R and NFPA 13 in parking garage, fire alarm,combustible Group C (residential) with Group F3 (Storage Garage). Subsidiary occupancies to Group C are dining room, activity room, lounge. Group C, Building area = 1198 m2 x 3 storeys & Group F3 = 915m2. Bldg description 3.2.2.45. Floor assemblies 1 Hour FRR/FS, 50 STM. Parking storage garage 1.5 hr. FRR/FS for exits & between other occupancies . Vestibule 0 hr. FS required to parkade. Duct shafts, 45 min FRR/FS, Exits 1 hour FRR/FS, Residential Suites doors only 20 min ULC labelled FPR. other door 45min FPR. 1 hr public cooridor to suites. Accessible to front entrance. Alternative solutions: Via water curtain sprinkler system for exit exposure for rear exit stairs & exit adjacent to Robarts Street . revised alternative solutions report for the dated July 9, 2008 accepted subject to: see attachments Doreen has file Oct 16 2009 |
| Application Status: | COMPLETED |
| Permit Value: | $5,300,000.00 |
| Builder: | MAPLE-REINDERS INC |
| Issued Date: | June 04, 2008 |
| File Close Date: | October 13, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 325 HECATE STREET | R15 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | CANCELLED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2009-10-13 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)