BP112427 - 4955 Vista View (parent) -- P1 4916 Coral (Bldg 2) SL4-5 VIS6656 -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP112427 - 4955 Vista View (parent) -- P1 4916 Coral (Bldg 2) SL4-5 VIS6656 -- Scanned
Neighbourhood: North Slope    
Street Address: 4955 Vista View (parent) -- P1 4916 Coral (Bldg 2) SL4-5 VIS6656 -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP112427
Date Application Submitted: January 22, 2008
Application Description: The Plateau -18 unit Townhouse development - Phase 1 - 1 duplex, 1 - triplex

Building 2 - BP for INSPECTION TASKS ONLY. See BP112418 for all other information.

101- 4916 Coral Way - Unit C - 145.39m2 gross floor area + 41.9m2 garage
102- 4916 Coral Way - Unit C - 145.39m2 gross floor area + 41.9m2 garage
Application Status: COMPLETED
Builder: R L S CONSTRUCTION
Issued Date: February 18, 2008
File Close Date: November 20, 2008

Associated Properties

Address Zone More
101   4916 CORAL WAY R6 Property Report
102   4916 CORAL WAY R6 Property Report
4955 VISTA VIEW CRESCENT R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
OCCUPANCY-OLD PASSED

2008-11-20

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.