BP112258 - 151 Craig St -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112258 - 151 Craig St -- Scanned | |
|---|---|
| Neighbourhood: | University District |
| Street Address: | 151 Craig St -- Scanned |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP112258 |
| Date Application Submitted: | November 19, 2007 |
| Application Description: |
Raise house 2 feet and add new foundation (unfinished basement). BOV00417 approval for front yard setback to be reduced from 6m to 3.74m and the flanking side yard setback be reduced from 10m to 3.85m. Revision Oct. 20, 2010: - adding rough-in for future 3 - piece bathroom, kitchen sink, laundry tub and washer AG |
| Application Status: | RETIRED |
| Permit Value: | $15,000.00 |
| Building Area: |
111.21 M2 1,197.05 ft2 |
| Issued Date: | May 02, 2008 |
| File Close Date: | February 06, 2012 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 151 CRAIG STREET | R14 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
COMPLETED |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
FAILED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)