BP112236 - 125 Wallace
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112236 - 125 Wallace | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 125 Wallace |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112236 |
| Date Application Submitted: | November 13, 2007 |
| Application Description: |
1203m2, 3-storey, shell, office bldg.1083.4m2 parking/retail level, 049.7m2 Level 2 office floor, 1096.4m2 Level 3 office floor and 55.5m2 service area on roof. 1.5 hr fire separation btwn storage garage, lobby, retail spaces & offices above, 3/4 hr FS exit stairs & elevator, FS only btwn lobby & retail suites, 1 hr FS for boiler room from adjoining suites. Future permits required to occupy tenant spaces. Main underslab plumbing lines only under this permit. Alternative Solution for exit exposure & glass in exit stair & btwn lobby & storage garage on first floor by GHL. Bldg Classification: 3.2.2.54.60., superimposed major occupancies, <2400m2, sprinklered with fire alarm, combustible or non-combustible construction OK, FS with no FRR for floor between level 2 to 3 of non-combustible construction, 45 min. FS for other floors (3.2.2.60.), 45 min. FRR for combustible supports of floor system. GHL report revision & Sprinkler drawings 05/19/08 VS |
| Application Status: | COMPLETED |
| Permit Value: | $4,500,000.00 |
| Builder: | WINDLEY CONTRACTING LTD |
| Issued Date: | January 29, 2008 |
| File Close Date: | February 20, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 125 WALLACE STREET | DT3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
FAILED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2009-02-20 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)