BP112236 - 125 Wallace

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP112236 - 125 Wallace
Neighbourhood: Downtown/Old City    
Street Address: 125 Wallace
Type of Application: Commercial / Multi / Industrial
File Number: BP112236
Date Application Submitted: November 13, 2007
Application Description: 1203m2, 3-storey, shell, office bldg.1083.4m2 parking/retail level, 049.7m2 Level 2 office floor, 1096.4m2 Level 3 office floor and 55.5m2 service area on roof. 1.5 hr fire separation btwn storage garage, lobby, retail spaces & offices above, 3/4 hr FS exit stairs & elevator, FS only btwn lobby & retail suites, 1 hr FS for boiler room from adjoining suites. Future permits required to occupy tenant spaces. Main underslab plumbing lines only under this permit. Alternative Solution for exit exposure & glass in exit stair & btwn lobby & storage garage on first floor by GHL.

Bldg Classification: 3.2.2.54.60., superimposed major occupancies, <2400m2, sprinklered with fire alarm, combustible or non-combustible construction OK, FS with no FRR for floor between level 2 to 3 of non-combustible construction, 45 min. FS for other floors (3.2.2.60.), 45 min. FRR for combustible supports of floor system.
GHL report revision & Sprinkler drawings 05/19/08 VS
Application Status: COMPLETED
Permit Value: $4,500,000.00
Builder: WINDLEY CONTRACTING LTD
Issued Date: January 29, 2008
File Close Date: February 20, 2009

Associated Properties

Address Zone More
125 WALLACE STREET DT3 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

CANCELLED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2009-02-20

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.