BP112231 - 2998 Hammond Bay -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP112231 - 2998 Hammond Bay -- Scanned
Neighbourhood: Linley Valley    
Street Address: 2998 Hammond Bay -- Scanned
Type of Application: Single / Two Family Dwelling
File Number: BP112231
Date Application Submitted: November 08, 2007
Application Description: Raise existing single family dwelling approx 20 inches and add:
20 x 32 ft garage with workshop under,
approx 14 x 20 ft connection addition,
approx 7 x 27.5 ft entrance addition,
approx 14 ft wide bedroom dormer upstairs,

Permit includes an unfinished basement with rough-in for secondary suite and wrap around deck, interior renovations, etc.

Revision submitted Oct..6, 2008:
1) Raising garage roof peak and changing design (adding gable at rear)
2) Lowering roof on living room addition AG

Revision submitted July 14, 2009:
1) interior wall changes on basement and upper levels


2) adding/changing plumbing fixtures AG
Application Status: COMPLETED
Permit Value: $400,000.00
Building Area: 124.30 M2
1,337.95 ft2
Builder: WHEATCROFT CONSTRUCTION
Issued Date: October 20, 2010
File Close Date: February 20, 2012

Associated Properties

Address Zone More
2998 HAMMOND BAY ROAD R1 Property Report

Process Steps

Task Status
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PARTIAL
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PARTIAL
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PARTIAL
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PASSED
PERIMETER DRAIN

For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering

PARTIAL
PERIMETER DRAIN

For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering

PARTIAL
PERIMETER DRAIN

For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

CANCELLED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

CANCELLED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

PASSED

2012-02-20

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.