BP112215 - 5080 Uplands (parent) Bldg 5 6149 Washington SL17-20 VIS6622
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112215 - 5080 Uplands (parent) Bldg 5 6149 Washington SL17-20 VIS6622 | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 5080 Uplands (parent) Bldg 5 6149 Washington SL17-20 VIS6622 |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112215 |
| Date Application Submitted: | June 26, 2008 |
| Application Description: |
Phase 3 Building 5 - 6149 Washington Way 6149 Washington Way - 1- fourplex, sprinklered, Type A, Unit 101 - 1204 Sq.Ft. - (111.85 sq.m) Type A, Unit 102 - 1204 Sq.Ft. - (111.85 sq.m) Type A, Unit 201 - 1204 Sq.Ft. - (111.85 sq.m) Type A, Unit 202 - 1204 Sq.Ft. - (111.85 sq.m) added one sink to upper unit. paid July 9, 2009 see CIB01237 - electronic master file |
| Application Status: | COMPLETED |
| Permit Value: | $453,647.52 |
| Builder: | OM DEVELOPMENT INC |
| Issued Date: | May 13, 2009 |
| File Close Date: | September 30, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 102 6149 WASHINGTON WAY | R8 | Property Report |
| 101 6149 WASHINGTON WAY | R8 | Property Report |
| 202 6149 WASHINGTON WAY | R8 | Property Report |
| 201 6149 WASHINGTON WAY | R8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2009-09-30 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)