BP112214 - 5080 Uplands (parent) Bldg 4 6157 Washington SL 9-12 VIS6622 -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP112214 - 5080 Uplands (parent) Bldg 4 6157 Washington SL 9-12 VIS6622 -- Scanned
Neighbourhood: Rutherford    
Street Address: 5080 Uplands (parent) Bldg 4 6157 Washington SL 9-12 VIS6622 -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP112214
Date Application Submitted: October 26, 2007
Application Description: Phase 2 - Electronic File --

INSPECTIONS ONLY
XREFERENCE BP112213 FOR THE MAIN PERMIT

Building 4 = 6157 Washington Way

Type B, Unit 101 - 1204 Sq.Ft. - (111.85 sq.m)
Type B, Unit 102 - 1204 Sq.Ft. - (111.85 sq.m)
Type B, Unit 201 - 1204 Sq.Ft. - (111.85 sq.m)
Type B, Unit 202 - 1204 Sq.Ft. - (111.85 sq.m)


See BP112213 for Building Permit Information

See CIB01237 (Multi-File) for title/summary/documents/addressing, strata plan phasing, etc.
Physical File Scanned + attached Jan 30, 2009 db
Application Status: COMPLETED
Builder: OM DEVELOPMENT INC
Issued Date: July 28, 2008
File Close Date: January 26, 2009

Associated Properties

Address Zone More
102   6165 WASHINGTON WAY R8 Property Report
101   6165 WASHINGTON WAY R8 Property Report
202   6165 WASHINGTON WAY R8 Property Report
201   6165 WASHINGTON WAY R8 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

FAILED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

FAILED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

FAILED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

SCHEDULED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
OCCUPANCY-OLD PASSED

2009-01-26

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.