BP112212 - 5080 Uplands (parent) Bldg 2 6173 Washington SL 5-8 VIS6622 -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP112212 - 5080 Uplands (parent) Bldg 2 6173 Washington SL 5-8 VIS6622 -- Scanned
Neighbourhood: Rutherford    
Street Address: 5080 Uplands (parent) Bldg 2 6173 Washington SL 5-8 VIS6622 -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP112212
Date Application Submitted: October 26, 2007
Application Description: Phase 1 - Electronic File --

INSPECTIONS ONLY

XREFERENCE BP112249 FOR THE MAIN PERMIT

6173 Washington Way - Entire Building 2- 1 fourplex sprinklered
INSPECTIONS Only

Type B, Unit 101 - 1204 Sq.Ft. - (111.85 sq.m)
Type B, Unit 102 - 1204 Sq.Ft. - (111.85 sq.m)
Type B, Unit 201 - 1204 Sq.Ft. - (111.85 sq.m)
Type B, Unit 202 - 1204 Sq.Ft. - (111.85 sq.m)

See BP 112249 for Building Permit Information
See CIB01237 - electronic master file
Application Status: COMPLETED
Builder: OM DEVELOPMENT INC
Issued Date: February 19, 2008
File Close Date: July 25, 2008

Associated Properties

Address Zone More
102   6173 WASHINGTON WAY R8 Property Report
201   6173 WASHINGTON WAY R8 Property Report
202   6173 WASHINGTON WAY R8 Property Report
101   6173 WASHINGTON WAY R8 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
WATER CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

CANCELLED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2008-07-30

FINAL-OLD

Final approval as per requirements on plans.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2008-07-30

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.