BP112192 - 6010 Uplands (Parent) P3, Main Bldgs 7B 8B, SL29-32 VIS6153 6031-6037 Leah Lane Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112192 - 6010 Uplands (Parent) P3, Main Bldgs 7B 8B, SL29-32 VIS6153 6031-6037 Leah Lane Scanned | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 6010 Uplands (Parent) P3, Main Bldgs 7B 8B, SL29-32 VIS6153 6031-6037 Leah Lane Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112192 |
| Date Application Submitted: | November 01, 2007 |
| Application Description: |
Phase 3: Sentinel Park - Multi-family development Two (2-storey on crawlspace) four-plex buildings, sprinklered. This is the Main Building Permit file & Inspections for Bldg. #7B (next to Hammond Bay Road): Unit #1: 6031 - Leah Lane- 1207 sq.ft. (112.13 m2) left upper Unit #2: 6033 - Leah Lane- 1207 sq.ft. (112.13 m2) left lower Unit #3: 6035 - Leah Lane- 1215 sq.ft. (112.88 m2) right lower Unit #4: 6037 - Leah Lane- 1198 sq.ft. (111.30 m2) right upper See BP112290 for Inspections for Bldg. 8B (next to Uplands Drive): Unit 1: 6041 - Leah Lane- 1207 sq.ft. (112.13 m2) left upper Unit 2: 6043 - Leah Lane- 1207 sq.ft. (112.13 m2) left lower Unit 3: 6045 - Leah Lane- 1215 sq.ft. (112.88 m2) right lower Unit 4: 6047 - Leah Lane- 1198 sq.ft. (111.30 m2) right upper Alternative Solution for a designated sprinkler head protecting a window exposing exit from upper units. Doreen has file Nov 6, 2008 |
| Application Status: | COMPLETED |
| Permit Value: | $767,067.00 |
| Builder: | NORED DEVELOPMENTS INC |
| Issued Date: | December 12, 2007 |
| File Close Date: | July 14, 2008 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6035 LEAH LANE | R6 | Property Report |
| 6037 LEAH LANE | R6 | Property Report |
| 6041 LEAH LANE | R6 | Property Report |
| 6043 LEAH LANE | R6 | Property Report |
| 6045 LEAH LANE | R6 | Property Report |
| 6047 LEAH LANE | R6 | Property Report |
| 6031 LEAH LANE | R6 | Property Report |
| 6033 LEAH LANE | R6 | Property Report |
| 6010 UPLANDS DRIVE | R6 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
FAILED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
SCHEDULED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
SCHEDULED |
| OCCUPANCY-OLD |
PASSED
2008-07-14 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)