BP112172 - 4717 Laguna Way (Parent) Phase 1 (Units 1-6) 4730 Skyline SL1-6,VIS6672
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112172 - 4717 Laguna Way (Parent) Phase 1 (Units 1-6) 4730 Skyline SL1-6,VIS6672 | |
|---|---|
| Neighbourhood: | North Slope |
| Street Address: | 4717 Laguna Way (Parent) Phase 1 (Units 1-6) 4730 Skyline SL1-6,VIS6672 |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP112172 |
| Date Application Submitted: | October 26, 2007 |
| Application Description: |
Laguna Way Multi-Family - 25 Units (6 Phases) Single family Dwellings: 2 storey units over crawl-space / 2 single-car garages. On-site servicing included as part of this permit (Phase 1). This permit is for Phase 1, Building C = 6-unit building of a six phase Multi-Family Development: Unit C1 = #106 - 4730 Skyline Way - 177.63m2 floor area, 46.82m2 garage Unit C2 = #105 - 4730 Skyline Way - 180.23m2 floor area, 46.82m2 garage Unit C3 = #104 - 4730 Skyline Way - 180.23m2 floor area, 46.82m2 garage Unit C4 = #103 - 4730 Skyline Way - 177.63m2 floor area, 46.82m2 garage Unit C5 = #102 - 4730 Skyline Way - 177.63m2 floor area, 46.82m2 garage Unit C6 = #101 - 4730 Skyline Way - 180.23m2 floor area, 46.82m2 garage see CIB01221 for Info -- all phases |
| Application Status: | COMPLETED |
| Permit Value: | $1,081,165.00 |
| Builder: | TDF DEVELOPMENTS INC |
| Issued Date: | January 04, 2008 |
| File Close Date: | December 01, 2008 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 4717 LAGUNA WAY | R10 | Property Report |
| 103 4730 SKYLINE WAY | R7 | Property Report |
| 104 4730 SKYLINE WAY | R7 | Property Report |
| 105 4730 SKYLINE WAY | R7 | Property Report |
| 106 4730 SKYLINE WAY | R7 | Property Report |
| 101 4730 SKYLINE WAY | R7 | Property Report |
| 102 4730 SKYLINE WAY | R7 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
CANCELLED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
FAILED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2008-12-01 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)