BP112133 - 501 Stewart
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112133 - 501 Stewart | |
|---|---|
| Neighbourhood: | Newcastle/Brechin |
| Street Address: | 501 Stewart |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP112133 |
| Date Application Submitted: | October 12, 2007 |
| Application Description: |
Demolish existing second floor and construct new 2nd floor addition on existing Single family dwelling / office building; 22 x 6 foot addition to rear of house ; 22 x 25 foot detached garage with connecting covered walkway. See DVP00127 for GFA & yard setbacks. BCLS Certificate of Location attached Jun 16, 2009 db Revision submitted June 26, 2009: - not building raised walkway or stairs from upper deck AG |
| Application Status: | COMPLETED |
| Permit Value: | $360,000.00 |
| Building Area: |
136.84 M2 1,472.93 ft2 |
| Builder: | MAZUR J CONTRACTING |
| Issued Date: | February 25, 2008 |
| File Close Date: | June 25, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 501 STEWART AVENUE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
CANCELLED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2009-06-25 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)